Extension of Fujairah Power Plant by :

  • Acquiring the existing 662 MW & 100 Mil. G/d Fujairah Co. Gen. Plant
  • 225 MW Combined Cycle additional generating capacity on BOO basis.
  • By adding one GT Unit 9 FA, HRSG, related BOP and civil works.
  • Plant Optimization

Bemco scope of work includes:

  • Electrical works such as GSU, IPB, MV And LV SWGR, DC System, Metering, Communication, Lighting, Cabling and Raceways.
  • Mechanical works such as Gas System, One Gas Compressor, Cooling Water System, Compressed air system, Fire Fighting, HVAC, piping including steam Piping.
  • All civil works
  • Erection of the Plant and support to Iberinco during plant commissioning.
Fujairah, U.A.E
219 Millions
SembCorp. Utilities
Aug 14, 2006 to Oct 31, 2008
ACTIVE POWER & TRANSMISSION
Fichtner