Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description

Supply, Installation, Testing and Commissioning of 8 No. GE Gas Turbines, 60MW each (ISO 85MW each) All civil works including earth works, equipment foundations, renches,

Scope of Work
Supply and installation of electrical systems and equipment such as:

  • 380 KV GIB modifications
  • 380 KV Cables
  • 380 KV Power Transformers
  • 380 KV Transition Bus
  • 132 KV GIB and Cables132 KV Power Transformer
  • Auxiliary & station transformers.
  • MV switchgear.
  • LV switchgear.
  • MV, LV & Control Cables.
  • Control and Instrumentation cables
  • Fire Fighting Systems.
  • Gas System
Riyadh, Saudi Arabia
832 Millions
SEC-COA
Feb 2004 To Sept. 2004
POWER GENERATION & TRANSMISSION
By the Client