Print
Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description


Scope of Work

The scope of work of this project is to extend the existing power station in Rafha by 20 MW power, with the installation of 4 No. 5 MW supplied by Wartsila Diesel Generators.

 This is a turnkey project where Wartsila Diesel will supply the generator and BEMCO will supply and build the rest of the plant and carry out the following works.

  • Installation of the generator sets.
  • Engineering of the complete plant.
  • Installation of the :

Complete Mechanical

  • System
  • Complete Electrical System.
  • Instrumentation & Controls System.
Rafha, Saudi Arabia
64 Millions
Electricity Corporation
1994 to 1998
POWER GENERATION & TRANSMISSION
By the Client