Print
Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description
132 KV GIS Substation with related switchgear and control protection and transformers jointly with SIEMENS .

Scope of Work
The scope of work of this Project includes Engineering, Supply, Installation, Testing and Commissioning of 380/110 Substation as follows:

  • 6 Bays 380 KV GIS
  • 1Bays 110 KV GIS
  • 2 Nos. 500 MV, 380/110 KV Transformers
  • Protection & Control
  • Auxiliary Systems
  • Gantries
  • Civil Works
  • Fire Fighting
  • Civil/Building
  • GIS/Switchgear
    • Building} 1,000 m2
    • Medium Voltage/Control Building}
Taif Saudi Arabia
91 Millions
SEC-WRB
23/07/02 To 22/07/04
POWER GENERATION & TRANSMISSION
Saudi Consult