Project Description


Scope of Work

Emergency/Standby Generating Plant consisting of 8 generating sets each 2.5 MW with rated voltage of 13.8 KV. The plant is fully automatic - in case of SCECO power failure, it will automatically start and deliver power to essential loads: Mosque, Car Park, Tunnel, CCTV, Telephone, Fire Alarm in a programmable and

controlled manner. A UPS system is available to cater for the transition period.

A "Primary Switchgear" which receives 13.8 KV from Haram II Substation and distributes power to the Plant Complex to both essential loads e.g. generating plant and non-essential loads e.g. chillers.

The "Emergency Switchgear" takes power from the "Primary Switchgear". In case of SCECO power failure, it delivers power to the Plant Complex, Mosque and Car Park.

Madina, Saudi Arabia
215 Millions
Ministry of Finance
Sept. 1990 To Nov. 1992
POWER GENERATION & TRANSMISSION