Print
Project Details
Location
Value in SR
Client
Period
Type
Consultant

Project Description
Two Grades of Gasoline & Additional Capacity Requirements North West Bulk Plants in Duba, Tabuk, Al-Jouf, and Turaif
Contract No. 6600012794


Scope of Work
Contractor scope of work shall include but not be limited to procurement, fabrication, forwarding and shipping, insurance, inland transportation, off-loading materials, storage and handling, construction, including all construction materials, tools & equipment, special tools (if any), local purchasing and manpower, quality control, inspection and testing, pre-commissioning, commissioning and performance testing assistance of the facilities in the Four (4) Bulk Plants. These facilities comprising mainly of the following, loading pumps, fire fighting system, oily drains, overhead lines, MV system, communications, SCADA system, instrumentation, buildings, roads & civil works. Aramco supplied equipment are TMS, loading modules, pumps & MV equipment).

4 Sites Duba/Tabuk / Al-Jouf / Turaif, Saudi Arabia
97 Millions
Saudi Aramco
Mar 13, 2005 to Aug 13, 2006
COMPLETED INDUSTRIAL
Saudi Aramco